Report to the Campus Network Committee
from
the Electronic Scheduling Advisory Group
Co-Chairs
Elise Meyer, Physics Department
Jamie Sonsini, Information Systems and Computing
July 23, 1998
Executive Summary
After 16 months of thorough research and analysis, the Electronic Scheduling Advisory Group recommends that the Campus Network Committee identify CorporateTime from Corporate Software & Technologies as the UC Santa Barbara campus standard for electronic scheduling and calendaring.
A total of 29 products were identified that provide scheduling and calendaring functionality based on reviewing publications, surveying other institutions, and attending industry tradeshows. An extensive effort was made to determine a set of requirements for a campus-wide software solution that reflected the existing campus standards and computing environment. These 12 items became our Filter Requirements. This effort also produced a list of technical, functional and administrative features desired in a campus-wide electronic scheduling and calendaring system. These 60 items became our Most Desirable, Desirable, and Least Desirable Features.
Only 8 of the initial 29 products met all our filter requirements. A Request For Information (RFI) consisting of questions regarding the filters, most desirable and desirable features was sent to these 8 vendors. The RFI responses were analyzed and scored and the top three vendors were then sent a Request For Proposal (RFP). Two of the vendors responded to the RFP. The RFP analysis included analyzing the vendor’s written response, installing the server product on both the NT Server and Unix platforms, testing the clients, and a financial analysis of the vendors. In addition, the vendors had an onsite presentation where the advisory group could ask any remaining questions. The vendor responses were scored and cost per quality point values were calculated. Corporate Software & Technologies’ CorporateTime was winning bid with the lowest cost per quality point value.
Several Colleges are considering implementing CorporateTime for their users, and Information Systems & Computing (IS&C) will be implementing it for their users as well as offering it free to any UCSB staff or faculty. In addition to recommending CorporateTime as a campus standard, the Advisory Group has 4 other recommendations:
The Electronic Scheduling Advisory Group wishes to thank the CNC for sponsoring this effort.
What is Electronic Scheduling and Calendaring?
An Electronic Scheduling and Calendaring system allows you to maintain your personal agenda or calendar in a single location that can be accessed from your office computer, home computer, or a Palm Pilot. With the appropriate group and permission assignments you can view the schedules of multiple people. Provided you and the people that you want to meet with either use the same system, or use a system configured for cross calendaring, you can use the scheduling function to determine dates and times when all of the meeting participants are available to attend your meeting and then have an invitation to that meeting automatically posted on their calendar. If appropriate, you even can assign a designate to manage your calendar and respond to meeting invitations for you.
Electronic Scheduling Advisory Group
Purpose
The Electronic Scheduling Advisory Group (ESAG) was formed in the spring of 1997 to develop a recommendation for a campus-wide electronic scheduling and calendaring system. The recommendation needed to be consistent and compatible with all previous Campus Network Committee (CNC) recommendations, including the Email Advisory Group’s recommendation for electronic mail.
Although such a scheduling system is likely to be most often used by administrative or faculty members of the campus community, the recommendation was not to preclude use by UCSB students.
Membership
The Electronic Scheduling Advisory Group has 20 members with 4 "observers." (See Appendix 1.) ESAG membership is comprised of individuals with either a technical background or expertise in using existing electronic scheduling systems on campus. Members also represent a cross-section of the campus community. An initial task was to identify and include any organization that was involved in electronic scheduling. Once work had progressed, all interested individuals were directed to the group web pages to stay apprised of the group’s effort.
Information about our effort has been posted at:
http://ucsbuxa.ucsb.edu/isc-web/osg/sbschd/sbschd.html
Advisory Group Structure
Several committees were formed to focus effort in specific areas.
Product Search Committee: Identified the products available in the marketplace.
Requirements Committee: Created a draft document which identified the elements, architecture and features important when evaluating products.
Survey/Reference Committee: Surveyed others to learn of products being used in the academic arena and, at the end of the process, checked references given us by the vendors responding to our Request for Proposal (RFP).
Demonstration Committee: Supplied the technical expertise and leadership needed during the on-site demonstration and evaluation phase. These individuals acquired, installed, configured, and supported products supplied by those vendors responding to our RFP.
Logistics
The ESAG held its first meeting on April 1, 1997 and met biweekly. See Appendix 2 for a detailed timeline of our work.
Requirements Process
The Requirements Committee produced a document that contained "items of interest" (technical, architectural, features, etc.). The ESAG reviewed and edited this document. A list of 72 items was created (Appendix 3). We did not, of course, expect any product would meet all 72 criteria but felt that these were the proper items for our analysis.
Each of the 72 items was then assigned to one of the following categories:
Filter Requirements
Most Desirable Features
Desirable Features
Least Desirable Features
The Filter requirements represented those items, which in the opinion of the ESAG, were absolutely essential for a product to be considered for use at UC Santa Barbara. These items address existing campus standards (e.g., TCP/IP as the communications protocol), the computing platforms most common on campus, features of a campus-wide solution, and any purchasing requirements (e.g., Year 2000 compliant).
The Filter Requirements were:
Products & Requirements
Product Search Committee
The Product Search committee identified 29 products in the marketplace (Appendix 4). They then determined which products met all of the 12 filter requirements. This generated the following list of products to be considered further:
|
Product |
Company |
|
CorporateTime |
Corporate Software & Technologies |
|
Groupwise |
Novell |
|
InterOffice |
Oracle |
|
Lotus Notes |
Lotus Development Corp |
|
Meeting Maker |
On Technology |
|
Netscape Calendar |
Netscape Communications Corp |
|
Pencil Me In |
Sarrus Software |
|
Synchronize |
Crosswind Technologies |
Request For Information
RFI Process
A Request for Information (RFI) was sent to all 8 vendors above who passed our filter requirements. This RFI included questions about:
Filter Requirements
Most Desirable Features
Desirable Features
The ESAG assigned weights to each feature category with Filter Requirements having a weight of 5 points, Most Desirable Features having a weight of 3 points, and Desirable Features having a weight of 1 point.
Responses were received from 7 vendors. Lotus declined to respond to our RFI. They cited the fact that they were a "suite" product and suggested that Lotus Notes was not a good match for our environment.
Evaluation Issues
A Product Sponsor was assigned to each vendor to be that product’s "champion." The Sponsor coordinated sending the RFI and any follow-up questions from ESAG to the vendor and then providing their responses back to the group.
The ESAG was divided into small groups (3 persons each). Each group was asked to evaluate responses from all vendors to 8 or 9 specific questions. Each group assigned a point value to the vendor’s answer:
0 = Did not support the feature
1= Supported the feature
2 = Supported the feature plus enhancements
The ESAG reviewed the points assigned. The evaluation groups were able to bring to the entire group’s attention any issues that they saw in the vendor responses, and the Product Sponsors were able to argue any point evaluations that they felt did not accurately represent the product. The weighted totals were calculated and discussion commenced on which vendors should move to the next step and receive our Request for Proposal (RFP). After consulting with our UCSB Purchasing Department and lots of discussion, we decided to issue the RFP to the vendors scoring in the top 3. It might be worth noting that the products in 4th and 5th place were tied for last place with regard to their scores on just the Filter Requirements. This meant that these products, although competitive with regard to features, were poor matches with the UCSB computing environment and our most essential criteria.
The RFP was sent to:
|
Company |
Product |
|
Corporate Software & Technologies |
CorporateTime |
|
Netscape Communications Corp |
Netscape Calendar |
|
Oracle |
InterOffice |
Request for Proposal
The RFP was created with assistance from the Gartner Group and the UCSB Purchasing Department. After several drafts, the final document was approved by the ESAG and issued to the vendors on February 23, 1998. The vendor responses were due back on April 15, 1998.
Within the RFP our evaluation criteria were:
The complete RFP is available for review at:
http://ucsbuxa.ucsb.edu/isc-web/osg/sbschd/rfp.html
RFP Evaluation
Oracle responded almost immediately and withdrew from our consideration. The company had made a strategic change regarding the client portion of the InterOffice product. They were beginning development of a Web client to eventually replace their native clients. They expected this effort to be complete early in 1999 and did not wish to expand their number of native clients. Based on this, they withdrew from consideration.
ESAG members studied the written RFP responses from Corporate Software & Technologies (CS&T) and Netscape Communications Corp. Several sets of additional questions or requests for clarification were exchanged with each vendor. A financial analysis was done on each company. As part of our RFP we required an on-site demonstration of each vendor’s product. The Demonstration Committee acquired server versions of the software (both NT Server and Unix) and individuals were permitted, using the Web, to acquire client software. Individual ESAG members initiated their own exploration of each product.
In late May, Corporate Software & Technologies provided a demonstration and discussion on campus. Our CS&T sales representative was joined by a senior member of CS&T’s technical support staff and by Andre Courtemanch, the President and CEO of CS&T. Netscape was not able to provide a demonstration, so Jamie Sonsini volunteered to conduct an on-site demonstration on their behalf. Netscape authorized this step on June 12, 1998 and Jamie conducted the demonstration on June 24, 1998.
Methodology
Each ESAG member was given a spreadsheet that included our evaluation criteria and the points (weighting) for each item. ESAG members were not required to assign points for every item. The Demonstration Committee (and not everyone), for example, was expected to evaluate the product administrative tools and features since they had the experience of installing and configuring the server software. ESAG members could select the criteria on which they would like to vote and then assign a point value for each vendor.
The RFP was decided on a "Cost per Quality Point" calculation:
Each vendor submitted a price for, essentially, a UCSB site license. This value was used as the dividend.
All scores for any criteria were averaged (the number of points assigned divided by the number of ESAG members assigning points for that criteria). The total of these averages was used as the divisor.
The cost value was divided by the number of points earned and a Cost per Quality Point was calculated for each product.
Evaluation
After reviewing the RFP submitted by each vendor, experimenting with the products, attending the on-campus demonstrations and lots of discussion, the ESAG members completed their spreadsheets and assigned points for each criteria. On July 6, 1998 the spreadsheets were sent to Jamie Sonsini who calculated the averages, totals and cost per quality point value for each product. Corporate Software & Technologies’ CorporateTime was the winning bid with the lowest cost per quality point value.
At the July 8, 1998 ESAG meeting, the Advisory Group discussed the final evaluation and unanimously accepted the result.
Recommendations
UC Santa Barbara Standard for Electronic Scheduling and Calendaring
The Electronic Scheduling Advisory Group recommends the Campus Network Committee identify CorporateTime, from Corporate Software & Technologies, as the UC Santa Barbara standard for electronic scheduling and calendaring.
As the ESAG progressed through the steps necessary to make a recommendation, we came to realize that for our plans to become a reality and benefit the campus, additional effort must be made in the area of planning and implementation.
Product Purchase Recommendation
Since several organizations will likely make a similar purchase, we recommend all parties work together to facilitate the best possible arrangement with Corporate Software & Technologies. Information Systems & Computing (IS&C) has volunteered to coordinate these purchases and will be offering CorporateTime services. Several other organizations are now considering providing this service for their constituents, including the College of Letters and Sciences and the College of Engineering.
The UCSB Technology Acquisition Support (TAS) group representative, Glenn Davis (IS&C), should be made aware of these purchases and suggest coordination with other UC campuses through the TAS group.
Implementation Group
We recommend that a group be formed to facilitate and coordinate the implementation of the CorporateTime product across the UCSB campus. This group can be called the CorporateTime Implementation Group (CIG). Initial CIG volunteers should include some members of the ESAG. Jamie Sonsini and Elise Meyer have volunteered to co-facilitate this group. ESAG members Tom Marazita, Terri Jo Ortega and Tamara Scott have also volunteered to participate.
CIG participants should include individuals responsible for system administration of servers providing CorporateTime services as well as those individuals responsible for supporting customers using the CorporateTime product within a department, division or organization.
Matters related to installing, configuring and supporting the CorporateTime product would be discussed by this group. Initial meetings are likely to be held in person, with later emphasis on electronic communication, as we become more familiar with the product and each other.
Organizations Wishing to Support Electronic Scheduling
For those organizations wishing to implement electronic scheduling and calendaring we recommend:
They purchase the CorporateTime server and client software.
They configure their server to allow cross-calendaring with all other CorporateTime servers located at UCSB.
They volunteer an individual (or two, if appropriate) to participate in the CorporateTime Implementation Group.
IS&C "Safety Net" - For Those Not Wishing to Support Electronic Scheduling
Information Systems and Computing (IS&C) would like to encourage the widespread use of electronic scheduling and would like to facilitate their own customers’ use of this service. To this end, IS&C has volunteered to offer, without charge, CorporateTime services to any faculty or staff at UCSB.
CorporateTime accounts on an IS&C server will be provided for all interested UCSB faculty or staff. For those needing "native" client licenses, IS&C will provide this software. For those for whom the CS&T Web interface (via any Web browser) is sufficient, only the IS&C server account would be necessary. IS&C staff will support those responsible for customer support within the department or division interested in using this service.
In Conclusion
The ESAG would like to thank the Campus Network Committee, and specifically Bob Sugar, for encouraging and supporting our efforts. The Campus Network Committee’s leadership in coordinating these campus-wide endeavors is valuable and much appreciated. Following acceptance by the CNC of our report and recommendation, the Electronic Scheduling Advisory Group will disband. We will, however, stay connected by our common experience and the benefit we hope our work will bring to the UCSB campus community.
Electronic Scheduling Advisory Group
|
Co-Chairs |
||||
|
Meyer, Elise M. |
Physics |
|||
|
Sonsini, Jamie A. |
Information Systems & Computing |
|||
|
Demonstration Committee |
||||
|
Gregg, George |
Housing |
|||
|
Handley, Phil |
Environmental Sciences & Management |
|||
|
Marazita, Tom |
Engineering Computing Infrastructure |
|||
|
Communications Services |
||||
|
Products Search Committee |
||||
|
Murdoch, Joan |
Humanities & Social Sciences Computing |
|||
|
Ortega, Terri Jo |
English |
|||
|
Rankin, Margaret |
Student Affairs |
|||
|
Tanguay, Jennifer |
Letters & Sciences/Spanish & Portuguese |
|||
|
VanGieson, Chris |
Admissions |
|||
|
Requirements Committee |
||||
|
Garcia, Robert |
Physical Facilities |
|||
|
Kuntz, Robert W. |
Budget & Planning |
|||
|
Lubach, Don |
Counseling & Career Services |
|||
|
Scott, Tamara |
Associated Students |
|||
|
Vasi, John |
Library |
|||
|
Survey/Reference Check Committee |
||||
|
Barron, Kevin |
Institute for Theoretical Physics |
|||
|
Kimsey, Stacey D. |
Chancellor’s Office |
|||
|
Ryan, Beverly |
Library |
|||
|
Smits, Jacek |
Psychology |
|||
|
Observers |
||||
|
Capello, Peter |
Computer Science |
|||
|
Lawton, Thomas |
Student Affairs |
|||
|
Murdock, Larry C. |
Biological Sciences & Psychology |
|||
|
Sugar, Bob |
Physics |
|||
ESAG Time Line
|
April |
1997 |
First meeting |
|
April - September |
1997 |
Develop requirements list |
|
Find 29 products |
||
|
September |
1997 |
Choose filters |
|
October |
1997 |
Classify features, set cutoff date |
|
Send out RFI to 8 vendors |
||
|
December |
1997 |
Evaluate RFI answers |
|
January |
1998 |
Determine which vendors will receive RFP |
|
Write RFP |
||
|
February |
1998 |
RFP approved and sent to 3 vendors |
|
April |
1998 |
Determine voting methodology and distribute responses |
|
May |
1998 |
Install servers |
|
First vendor presentation |
||
|
June |
1998 |
Second vendor presentation |
|
July |
1998 |
Score RFP responses and determine winning bid |
Features Items
F - Filter Requirement
1 - Most Desirable Feature
2 - Desirable Feature
3 - Least Desirable Feature
|
Communications |
||||||||||
|
F |
Client/server based solution (see glossary). |
|||||||||
|
F |
TCP/IP (server to server and client to server). |
|||||||||
|
F |
If Email notification is utilized, then SMTP must be used for mail delivery. |
|||||||||
|
1 |
Fully functional over a PPP connection (intended for remote access). |
|||||||||
|
2 |
System shall efficiently use network resources. |
|||||||||
|
Security |
||||||||||
|
F |
Login Authentication. |
|||||||||
|
1 |
Encrypted passwords. |
|||||||||
|
1 |
User can change his/her password. |
|||||||||
|
2 |
Supports DCE (Distributed Computing Environment) authentication. |
|||||||||
|
DCE support must be in production or in company's statement of direction. |
||||||||||
|
2 |
Kerberos version 5 compatibility. |
|||||||||
|
2 |
Encrypted client/server communication. |
|||||||||
|
Overall Product Features |
||||||||||
|
2 |
Ability to import/export data from/to non-calendaring applications. |
|||||||||
|
3 |
Ability to migrate from existing calendaring & scheduling systems. |
|||||||||
|
F |
Proxy capable and provides various levels of security for |
|||||||||
|
access/control managed by administrator or user/client. |
||||||||||
|
2 |
Ability to schedule events for multiple years. |
|||||||||
|
1 |
Ability to perform free or busy time search. Client displays conflicts |
|||||||||
|
and allows meeting invitee to manually reschedule items. |
||||||||||
|
F |
Year 2000 compliant. |
|||||||||
|
2 |
To-do lists integrated with calendar functions. |
|||||||||
|
2 |
Ability to schedule rooms and resources. |
|||||||||
|
3 |
Worldwide time zone conversion. |
|||||||||
|
2 |
System administrator should be able to create campus information, |
|||||||||
|
and individuals should be able to include these events, notes, or |
||||||||||
|
templates into their own calendars. |
||||||||||
|
3 |
Ability to incorporate attachments into meeting invitations. |
|||||||||
|
Client OS |
||||||||||
|
F |
Macintosh (system 7.0 and higher). |
|||||||||
|
1 |
Windows 3.1. |
|||||||||
|
F |
Windows 95. |
|||||||||
|
1 |
Windows NT v3.5 or higher. |
|||||||||
|
2 |
Web user interface (in production or in company's statement of direction). |
|||||||||
|
3 |
Support of the X protocol. |
|||||||||
|
3 |
Spelling checker. |
|||||||||
|
Server OS |
||||||||||
|
The server software runs natively under the following operating systems: |
||||||||||
|
F |
UNIX (may include: HP, Solaris, Sun/X.86, Digital Unix, IRIX, AIX). |
|||||||||
|
1 |
Novell. |
|||||||||
|
F |
NT Server (in production or in the company's statement of direction). |
|||||||||
|
3 |
Alpha NT. |
|||||||||
|
Server Requirements |
||||||||||
|
F |
Accommodation for all faculty and staff accounts (10,000) and can be |
|||||||||
|
scaled to support faculty, staff, and student accounts (30,000). |
||||||||||
|
1 |
Server to server busy time searches. |
|||||||||
|
3 |
Ability to interoperate with other calendaring & scheduling systems. |
|||||||||
|
3 |
Ability to perform free or busy time searches across various calendaring systems. |
|||||||||
|
F |
Calendar and access control data stored on the server. |
|||||||||
|
1 |
Calendar information may reside on one or more servers, but will be |
|||||||||
|
accessed by users transparently; i.e., users do not need to know on |
||||||||||
|
which server their schedule is stored. |
||||||||||
|
2 |
Limits by user ID on server storage space; ability to monitor amount of |
|||||||||
|
storage used by individual users. |
||||||||||
|
2 |
Currently supports 5% of all accounts making simultaneous server |
|||||||||
|
connections (is there an inherent software limitation to simultaneous |
||||||||||
|
actions?). |
||||||||||
|
1 |
Distributed servers (is there a maximum number of servers?). |
|||||||||
|
1 |
The vendor should provide a reliable environment. It should be fault |
|||||||||
|
tolerant (e.g., does it provide data replication or is RAID compliant |
||||||||||
|
hardware required?). |
||||||||||
|
2 |
Efficient administrative tools for handling large numbers of accounts |
|||||||||
|
(e.g., automated account generation, mass account terminations, |
||||||||||
|
ability to customize tools). |
||||||||||
|
2 |
Ability to move calendars from one username to another. |
|||||||||
|
2 |
Backups can be performed without disruption of service. |
|||||||||
|
2 |
Tools for performance monitoring and system tuning. |
|||||||||
|
3 |
Ability to audit administrative tasks, standard connection |
|||||||||
|
patterns, transaction records. |
||||||||||
|
3 |
Ability to control which users are connecting to which servers (by |
|||||||||
|
client address or user ID). |
||||||||||
|
3 |
Convenient format for user ID (perhaps matching user's Email address). |
|||||||||
|
2 |
Doesn't require a proprietary directory service, i.e., can use one of |
|||||||||
|
the existing or planned campus directory services (e.g., LDAP, X.500). |
||||||||||
|
2 |
The server (not the client) should provide directory data to locate |
|||||||||
|
where a user's calendar data are stored. |
||||||||||
|
1 |
Preference shall be given to vendors who are committed to conforming to |
|||||||||
|
calendaring & scheduling open standards. |
||||||||||
|
2 |
Reasonable recovery from lost connections, requiring no intervention on |
|||||||||
|
server and minimal work loss on client end. |
||||||||||
|
Client Requirements |
||||||||||
|
1 |
After a client meets vendor's minimum hardware requirement, the |
|||||||||
|
application shall be robust (i.e., should not crash a normally |
||||||||||
|
configured computer) and responsive. |
||||||||||
|
2 |
Ability to download authorized data for local manipulation and |
|||||||||
|
subsequent upload to server for data synchronization. |
||||||||||
|
2 |
Client software supports full functionality via low-speed IP connection. |
|||||||||
|
3 |
Ability to archive data for easy retrieval. |
|||||||||
|
1 |
Meeting initiator can send an invitation for a meeting regardless of |
|||||||||
|
invitees prior commitments (free or busy time search first not required). |
||||||||||
|
1 |
Ability to view schedules for day, week, month, and selected day sequences. |
|||||||||
|
1 |
Ability to accept, view, and manage multiple events scheduled for the |
|||||||||
|
same time. |
||||||||||
|
1 |
Schedule, move, and cancel recurring meetings (weekly, bi-weekly, |
|||||||||
|
monthly, quarterly, etc.). |
||||||||||
|
1 |
Automatic conflict detection (after a conflict is detected, the system |
|||||||||
|
automatically presents the user with a list of non-conflicting times |
||||||||||
|
and displays individual conflicts). |
||||||||||
|
2 |
Option to notify meeting initiator automatically when user cancels attendance. |
|||||||||
|
1 |
Ability to identify groups and view their schedules. |
|||||||||
|
1 |
Ability to print calendars with different format customization. |
|||||||||
|
3 |
Report customization (data extracted from prior or future meetings, |
|||||||||
|
(e.g., how many meetings have been held in the past six months with |
||||||||||
|
person x ?). |
||||||||||
|
1 |
Ability to provide notification of proposed or scheduled meetings |
|||||||||
|
via audible alarm, e-mail, or other reminder. |
||||||||||
|
1 |
Intuitive user interface with on-line help access. |
|||||||||
|
2 |
Ability for meeting initiator or meeting invitee to notify non-invitees |
|||||||||
|
of meeting information. |
||||||||||
|
2 |
Ability to invite or notify non-calendaring & scheduling users of meetings. |
|||||||||
|
1 |
Upon receipt of an invitation, again upon acceptance of meeting, |
|||||||||
|
and upon cancellation of a meeting by meeting initiator, user |
||||||||||
|
calendars are automatically updated. |
||||||||||
|
3 |
Configuration supports multiple users in a public access environment. |
|||||||||
|
Licensing and Support |
||||||||||
|
1 |
Simple, campus-wide licensing; easy distribution of (and upgrades to) |
|||||||||
|
software with minimal reporting required (no per-system or per-user |
||||||||||
|
registration). |
||||||||||
|
2 |
Technical resources and documentation to allow support staff to better |
|||||||||
|
understand, customize, or extend the system (source code or |
||||||||||
|
application programming interfaces [API]). |
||||||||||
|
1 |
Scalability of technical support contacts and distribution media |
|||||||||
|
related to number of servers and clients. |
||||||||||
|
Glossary |
||||||||||
|
Client/Server: |
||||||||||
|
Client/Server based solution - a process running on the client and an associated process running on the server system that does not require that the client establish a remote file system mount on the server. The client and server are communicating via some access protocol instead of a file sharing access protocol (e.g., NFS, Appleshare). Our objective here is to maximize efficient communication between the client and server and to minimize system demand on the client, server and the network between them. |
||||||||||
Initial Set of 29 Products Considered
|
Product Name |
Vendor |
|
ACT! |
Symantec |
|
ActionPlan |
Netmosphere |
|
Calendar Manager |
Russell Inf Systems |
|
Clockwise |
Phase2 Software Corp. |
|
CorporateTime |
Corporate Software & Technologies |
|
Emmissary |
Attachmate |
|
GoldMine |
GoldMine Software Corp. |
|
GroupWise |
Novell |
|
Groupworks |
Island Way |
|
InterOffice |
Oracle |
|
Interpol Suite |
Oblix, Inc. |
|
Janna Contact and Trade |
Janna Systems |
|
MeetingMaker |
ON Technology Corp. |
|
MicroSoft Schedule+ |
Microsoft Corp. |
|
Netscape Calendar |
Netscape Communications Corp. |
|
Notes C&S, Organizer |
Lotus Development Corp. |
|
Now Up to Date |
Now Software |
|
Office-Logic |
LAN-ACES, Inc. |
|
Office Tracker Pro |
Milum |
|
On Time |
FTP Software |
|
On Track |
Action Technology |
|
PencilMeIn |
Sarrus Software |
|
PowerCal+ |
Sigma Six |
|
Relish |
Sundial Systems |
|
Sidekick 95 |
Starfish Software |
|
Synchronize |
Crosswind Technology |
|
Taskey Personal |
Task Solutions |
|
Team Agenda |
Teamsoft |
|
Web Arranger |
CE Software, Clear Blue Network Systems, Inc. |